Call Me FreeCall Me Free Send SMS
+918037303781
EOT Crane Wheel Assembly

EOT Crane Wheel Assembly

250 onwards INR/Piece

Product Details:

  • Material MS
  • Supply Ability : 100000 Piece Per Week
  • Click to view more
X

Price And Quantity

  • 250 onwards INR/Piece
  • 1 Piece

Product Specifications

  • MS

Trade Information

  • 100000 Piece Per Week
  • 1 Week

Product Description

Currently, large portion of the Crane Wheel Assembly are utilizing En 8 or En 9 material forgings for wheels that are produced in forging because of which we need to disburse @ 30% more money towards the fundamental Material and this extra material, we have to expel in machining by contributing additionally machining time. Forgings lead time is min 4-5 weeks from the date of request and 1 week for heat treatment, machining, and different finishing (e.g. bore pounding). It implies, we need to design the material prior to 5 to a month and a half. In the event of En 24, we need couple of more days for machining time because of high hardness as contrast with En 9 as to evade high acquirement time and hefty machining, we have built Crane Wheel Assembly in SGI 800/2 material. Primary property of our assembly is self oil and high quality.

SILVERLINE METAL ENGINEERING PVT. LTD.

* Tips on getting accurate quotes. Please include product name, order quantity, usage, special requests if any in your inquiry.



Back to top